Project / Sharm El Sheikh

The Lifeco Beach

Primary infrastructure and rough-in installations for electrical, fire alarm, low-current, and IT networks.

Location
Sharm El Sheikh
Start date
01 Mar 2026
Completion date
15 Mar 2026
Work categories
Electrical / Low Current / Fire Alarm
Project image — The Lifeco Beach
The Lifeco Beach / Sharm El Sheikh

Project scope

Scope of work.

The project encompasses the primary infrastructure and rough-in installations for all electrical systems. The scope includes the implementation of fire alarm systems, comprehensive low-current networks, and IT network infrastructure.

  • Electrical
  • Low Current
  • Fire Alarm